29 CFR 1910.119 · 40 CFR PART 68
Every element of your ammonia PSM program, in one system of record.
CompAI runs the fourteen OSHA elements and six EPA elements your anhydrous ammonia refrigeration facility is required to maintain — process hazard analysis, mechanical integrity, training, incident investigation — with citations attached to every checklist item, not buried in a binder.
Built for cold storage, food processing, and industrial refrigeration facilities operating under 40 CFR 68 — and for smaller ammonia systems below the 10,000 lb threshold using a voluntary program instead.
The actual Process Safety Dashboard — live compliance status, work orders, and inventory tracking for one facility.
See CompAI in about a minute
Live inventory, RAGAGEP tracking, the Inspectors Toolbox and the ammonia technical assistant.
A PSM violation isn't a paperwork problem until it's an ammonia release.
Most PSM programs fail quietly: a PHA revalidation slips past five years, a compliance audit report goes missing, a relief valve inspection gets logged in a spreadsheet nobody opens again. None of that shows up until an inspector — or an incident — goes looking for it.
CompAI keeps the fourteen OSHA elements and six EPA elements as living records instead of static binders: each one shows what's current, what's due, and what the actual regulation requires, with the citation attached to the requirement rather than filed away in a separate document.
20 elements, one record
Fourteen OSHA elements. Six EPA elements. Nothing left to a binder.
OSHA · §1910.119
Employee Participation
OSHA · §1910.119
Process Safety Information
OSHA · §1910.119
Process Hazard Analysis
OSHA · §1910.119
Operating Procedures
OSHA · §1910.119
Training
OSHA · §1910.119
Contractors
OSHA · §1910.119
Pre-Startup Safety Review
OSHA · §1910.119
Mechanical Integrity
OSHA · §1910.119
Hot Work Permit
OSHA · §1910.119
Management of Change
OSHA · §1910.119
Incident Investigation
OSHA · §1910.119
Emergency Planning & Response
OSHA · §1910.119
Compliance Audits
OSHA · §1910.119
Trade Secrets
EPA · 40 CFR 68
Management System
EPA · 40 CFR 68
Hazard Assessment
EPA · 40 CFR 68
Prevention Program
EPA · 40 CFR 68
Emergency Response
EPA · 40 CFR 68
RMP Submission
EPA · 40 CFR 68
Recordkeeping & Updates
Platform
Built around how a PSM program actually runs day to day.
Mechanical integrity, per IIAR 6
Inspection checklists for compressors, vessels, evaporators, and relief systems, tracked against the RAGAGEP edition your facility actually inspects to — with a flag if that edition falls behind the standard body's current one.
SOP drafting, grounded in your process
Generate a first draft of startup, shutdown, and emergency operating procedures from your facility's actual equipment list — reviewed and finalized by your team, never presented as a substitute for engineering sign-off.
Deadlines that don't depend on memory
Three-year audit cycles, five-year PHA revalidations, training refreshers — tracked automatically and surfaced before they're due, not after an inspector asks where the report is.
A record of who changed what
PHA recommendations, MOC records, and incident investigations carry an audit trail tied to the signed-in user — not a free-text name field anyone could type over.
Built in
A technical assistant that only knows your industry.
The CompAI Technical Assistant is grounded specifically in ammonia refrigeration engineering and OSHA/EPA process safety regulation — not a general-purpose chatbot with a safety topic bolted on. Ask it something outside that scope and it says so, rather than improvising an answer.
Equipment-level knowledge
Screw and reciprocating compressors, evaporative condensers, pressure vessels, oil systems, valves and piping — by manufacturer and configuration, not generic refrigeration theory.
Citations, not just answers
Responses reference the actual standard behind them — 1910.119, 40 CFR 68, ANSI/IIAR, ASME, ASHRAE — so you can verify the source instead of taking the answer on faith.
Mechanical integrity support
NDT and inspection intervals, relief valve testing cadence, vibration and oil-sampling guidance, and RAGAGEP references for your mechanical integrity program.
First-draft SOPs from your equipment list
Generates a starting draft of startup, shutdown, and emergency procedures based on the equipment actually on file for your facility — always reviewed and finalized by your team before use.
The Assistant supports your process safety program — it doesn't replace the judgment of a qualified process safety engineer, and nothing it produces should be treated as final without your team's review.
10,000 lbs and above
Full PSM & RMP
Facilities at or above the threshold get the full fourteen-element OSHA program and six-element EPA program — PHA, PSSR, compliance audits, RMP submission tracking, all of it.
Below 10,000 lbs
ARM Program
Smaller systems aren't exempt from safety obligations, just from PSM/RMP. CompAI runs the fifteen-element ARM program instead — grounded in the General Duty Clause and EPCRA — and switches automatically if your inventory crosses the line.
Get instant demo access to your sandboxed CompAI facility.
Fill out the form below to provision a real, isolated, time-limited demo account. You'll get immediate hands-on access to a sandboxed environment pre-loaded with realistic OSHA PSM and EPA RMP compliance records.
Demo Access Provisioned
We've created your isolated sandboxed facility and emailed your temporary login credentials. Check your inbox to sign in right now.